05.02.2013 Views

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX C<br />

RESPONSIBILITIES<br />

Fleet Commander<br />

Section Area of Responsibility Responsibility<br />

I-FWD-7.3.1 Life Cycle Maintenance<br />

Process for JFMM<br />

II-I-3.3.6.1 Maintenance Policies and<br />

Procedures<br />

I-FWD-C-1<br />

COMFLTFORCOMINST 4790.3 REV A CH-4<br />

• Establish a JFMM Board of Directors (BOD)<br />

• Provide final approval and promulgation letter<br />

• Provide funding for life cycle maintenance<br />

• Approve all Advanced Change Notices (ACN)<br />

• Convene periodic JFMM BOD review<br />

meetings<br />

• Designate Atlantic and Pacific Fleet JFMM<br />

Coordinators<br />

• Maintain availability intervals and cycles<br />

• Inform of changes affecting ship manning<br />

requirements<br />

• Coordinate as applicable to accomplish<br />

availability planning<br />

• Implement Docking Officer Qualifications and<br />

Certifications<br />

• Plan and monitor availability execution<br />

• Plan and provide berthing, messing, etc., if<br />

necessary<br />

II-I-3.6.1.1 Availability Execution • Monitor to achieve balance of cost and<br />

schedule<br />

• Ensure testing of applicable systems is<br />

conducted prior to availability completion<br />

• Provide berthing, messing, etc., if necessary<br />

IV-3.3.3 Boiler Inspections • Identify and designate inspection<br />

responsibilities<br />

• Ensure inspection report is recorded and<br />

updated in BIRMIS<br />

• Schedule and coordinate inspections to avoid<br />

unnecessary opening of boilers<br />

• Ensure availability of "school ships"<br />

• Suspension of SGPIs who fail to comply with<br />

requirements of certification<br />

• Administer and control TYCOM pre-test<br />

program<br />

• Host semi-annual SGPI seminars<br />

V-I-1.2.1 Organizational<br />

Responsibilities<br />

• Provide qualified SGPI when requested<br />

• Promulgate QA Program through guidelines of<br />

Volume V of JFMM<br />

• Promote use of Volume V of JFMM by<br />

TYCOMs<br />

• Jointly authorize changes to Volume V of<br />

JFMM<br />

• Review TYCOM QA program by annual<br />

conference<br />

• Assessments of FMAs and RMCs occur in<br />

accordance with Volume IV, Chapter 2,<br />

paragraph 2.1.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!