JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Key Used In The<br />

Following<br />

Columns<br />

Definition<br />

COMFLTFORCOMINST 4790.3 REV A<br />

G/F N/S Action, PSA Government responsible to approve for accomplishment for Forces Afloat. Ship<br />

Program Manager/Supervising Authority will provide material or technical/design<br />

assist as required.<br />

GI All Ship Program Manager investigate and authorize correction as appropriate.<br />

G/V N/S Action, PSA Government responsible - equipment still under guarantee. Vendor responsible<br />

for correcting condition as noted. Supervising Authority responsible to ensure<br />

vendor is available and correction is taken under vendor supervision.<br />

K N/S Action, PSA Shipbuilder responsible, authorized to correct condition noted as necessary to<br />

comply with shipbuilding specifications.<br />

KA K Shipbuilder accepts responsibility for correction with or without comment.<br />

Comment on attached supplementary page.<br />

K/F N/S Action, PSA Shipbuilder responsible to make installations and all repair work. Shipboard<br />

testing approved for accomplishment by Forces Afloat.<br />

K/G N/S Shipbuilder responsible, authorized to investigate and correct condition noted as<br />

necessary to comply with shipbuilding specifications. Government responsible for<br />

defects in Government Furnished Equipment (GFE) or Government Furnished<br />

Information (GFI). No work authorized for government portion of item without<br />

separate specific Ship Program Manager action.<br />

KI K Shipbuilder accepts item for investigation with determination of responsibility to<br />

be made after investigation.<br />

KZ K Shipbuilder does not accept the item as his responsibility. Rationale to be<br />

provided on attached supplementary page.<br />

NA N/S Action Not authorized using SCN funds:<br />

SA Final, TYCOM,<br />

N/S<br />

1. Cost not commensurate with gain.<br />

2. No longer considered a deficiency.<br />

3. Recommend correction be accomplished by a SHIPALT during future<br />

availability.<br />

Recommend SHIPALT be developed to correct.<br />

SC SOS Comments of shipbuilder are accepted and concurred with by the Supervising<br />

Authority.<br />

SI N/S Action Silencing deficiency items with responsibility and authorization to be determined<br />

by separate Ship Program Manager action.<br />