05.02.2013 Views

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Immediate Superior in Command (ISIC)<br />

Section Area of Responsibility Responsibility<br />

II-I-3.3.6.3 Maintenance Policies and<br />

Procedures<br />

II-I-3.3.6.3b<br />

(Submarines<br />

Only)<br />

Maintenance Policies and<br />

Procedures<br />

II-I-4.3.5 Maintenance Policies and<br />

Procedures for TYCOM<br />

scheduled availabilities<br />

I-FWD-C-9<br />

COMFLTFORCOMINST 4790.3 REV A CH-6<br />

• Assist TYCOM and SUBMEPP in preparation<br />

of AWP<br />

• Monitor corrective maintenance action taken<br />

• Schedule and conduct inspections of Forces<br />

Afloat<br />

• Monitor progress of CNO maintenance<br />

availabilities<br />

• Ensure that a MOA is executed prior to<br />

availability start<br />

• Ensure timely accomplishment and reporting of<br />

PMR Maintenance<br />

• Ensure industrial activities and ships maintain<br />

current copies of Maintenance Standards, PMR<br />

schedules and inventories<br />

• Review Ship's Force submitted deferrals for<br />

industrial activity assistance<br />

• Ensure industrial activities provide 3-M and<br />

MS feedback for analysis by SUBMEPP<br />

• Request SUBMEPP assistance as necessary for<br />

assistance with PMR scheduling and software<br />

• Report to SUBMEPP inability to perform<br />

PMRs<br />

• Designate Availability Coordinator<br />

• Provide updated Sea Trials status to<br />

COMSUBDEVRON FIVE<br />

• For minor CNO maintenance availabilities<br />

issue required messages as applicable<br />

• Coordinate scheduling of FMAs<br />

• Coordinate work loading of FMAs<br />

• Initiate budgetary actions for funding FMAVs<br />

• Alterations identified by priority based on<br />

material availability<br />

• Identify routine packages<br />

• Screen and forward prioritized work packages<br />

• Review results of monitoring inspections and<br />

testing<br />

• Identify support requirements<br />

• Identify special evolutions<br />

• Conduct WDC/PRC<br />

• Conduct PAC<br />

• Issue availability planning message

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!