NOTE:<br />

BUILDER<br />

TRIALS<br />

CORRECT<br />

DEFICIENCIES<br />

FOR AT/UT<br />

ACCEPTANCE<br />

UNDERWAY TRIALS<br />

CORRECT<br />

AT/UT<br />

DEFICIENCIES<br />

3-8 weeks<br />

APPENDIX A<br />

MAJOR FUNDING MILESTONES DURING<br />

CONSTRUCTION/CONVERSION<br />

LIGHT-OFF<br />

ASSESSMENT<br />

(LOA)<br />

DELIVERY<br />

10-90 days<br />

FAST CRUISE<br />

GUARANTEE PERIOD (6 mos)<br />

FITTING<br />

OUT<br />

1/<br />

RFS<br />

SCN<br />

COMFLTFORCOMINST 4790.3 REV A<br />

OPERATIONAL PROPULSION<br />

PLANT EXAM (OPPE)<br />

COMMISSIONING<br />

FINAL CONTRACT<br />

TRIALS<br />

POST DELIVERY<br />

TEST AND TRIALS<br />

AND SHAKEDOWN<br />

3/<br />

11 mos<br />

1/<br />

POST<br />

SHAKEDOWN 2/<br />

AVAILABILITY<br />

3 mos<br />

SCN/1<br />

OBLIGATION WORK<br />

LIMITING DATE<br />

1 mo<br />

O&MN,<br />

OPN,<br />

WPN<br />

1. SSN/CVN fitting out is complete prior to delivery. Hence, the SCN obligation work limiting date is at the end of the 11 th<br />

month after the month in which delivery occurs.<br />

2. PSA is normally scheduled to complete approximately one month prior to the obligation limiting date.<br />

3. Total period of PDT&T and Shakedown shall be a minimum of six months. A waiver may be granted for a period<br />

greater than eight months; a request to extend SCN obligation limiting date may be required.<br />