COMFLTFORCOMINST 4790.3 REV A CH-1<br />

g. (Submarines only) Scheduling a salvage inspection in time to have discrepancies corrected prior to Fast<br />

Cruise.<br />

h. (Submarines only) Prior to Fast Cruise, auditing Ship's Force Re-entry Control and Departure from<br />

Specification Records. Using the Submarine Maintenance Engineering, Planning and Procurement<br />

(SUBMEPP) Activity URO Maintenance Requirement Card (MRC) scheduling reports and current<br />

Industrial Activity/Ship's Force updates to the latest report, ensure URO MRC accomplishment is<br />

current.<br />

i. (Submarines only) Conducting a material inspection consisting of a vertical audit of Ship's Force and<br />

Fleet Maintenance Activity SUBSAFE work and URO completion status per Volume V, Part I, Chapter<br />

9 of this manual.<br />

j. (Submarines only) Reporting satisfactory completion of the inspections of paragraphs 2.5.2.c, 2.5.2.h<br />

and 2.5.2.i of this chapter to the TYCOM in one "priority," crew certification message per the sample<br />

message (Appendix O of this chapter), paralleled by a telephone call to the TYCOM Watch Officer<br />

reporting the date-time group of the message.<br />

k. (Submarines only) Advising the TYCOM by message of escort requirements and ensuring that an escort<br />

is provided during the initial tightness dive, the deep dive and emergency blow tests as required by<br />

Volume I, Chapter 6, section 6.4 of this manual.<br />

l. (Submarines only) Providing updated Sea Trials status by telephone to Commander Submarine<br />

Development Squadron (COMSUBDEVRON) Five if Deep Submergence Rescue Vehicle (DSRV)<br />

Modified Alert support services are in use per Volume I, Chapter 4, paragraph 4.4.3.c of this manual.<br />

m. (Submarines only) Providing an operations order, copy to the TYCOM and, where appropriate, the local<br />

ISIC, with an information copy to the CNO and the Fleet Commander. Include within the operations<br />

order instructions to send specific messages announcing the commencement and completion of the<br />

initial deep dive with the TYCOM as an information addressee.<br />

n. If deficiencies exist and/or it appears that extension of time is required to correct training/material<br />

deficiencies, the TYCOM shall be immediately advised by telephone and message. The Supervising<br />

Authority will be included as an information addressee. The TYCOM retains the prerogative to<br />

authorize corrective action by the Industrial Activity in the case of material deficiencies.<br />

o. When authorized by the TYCOM, direct the ship to get underway for Sea Trials.<br />

2.6 BUILDING YARD. The Building yard is an industrial activity responsible for construction of the ship,<br />

correction of shipbuilder responsible deficiencies and additional logistic support products as delineated in the<br />

contract. The following is a sample listing of the shipbuilder's products and responsibilities.<br />

a. Technical Manuals for Contractor Furnished Equipment (CFE).<br />

b. Ship Information Book (SIB)/Ship Systems Manual (SSM).<br />

c. PMS for new systems when tasked by Ship Program Managers or cognizant NAVSEA code.<br />

d. Selected Familiarization Training.<br />

e. Ship Drawings.<br />

f. Advising the Accepting Authority and the TYCOM of the date of initial criticality.<br />

I-2-13