05.02.2013 Views

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VI-8.2.3 Miniature/Micro-miniature<br />

Electronic Repair Program<br />

VI-9.2.5 Metrology and Calibration<br />

Program<br />

VI-11.5.3 Maintenance, Repair and<br />

Overhaul of Service Craft,<br />

Landing Craft and Small<br />

Boats<br />

I-FWD-C-23<br />

COMFLTFORCOMINST 4790.3 REV A CH-4<br />

• Establish 2M program under cognizance of<br />

Electronics Material Officer and Combat<br />

Systems Officer<br />

• Maintain certified 2M stations and technicians<br />

• Screen and repair all CCAs/Ems<br />

• (Aircraft Carriers) establish MTRF with an<br />

overall coordinator<br />

• (Aircraft Carriers) maintain an active MTRF<br />

• Maintain high degree of TAMS calibration<br />

readiness<br />

• Appoint a calibration coordinator<br />

• Ensure only operational TAMS are submitted<br />

for calibration<br />

• Perform repair of TAMS within capability of<br />

Ship's Force<br />

• Maintain calibration readiness goal<br />

• Coordinate planning aspects of craft and/or<br />

boat overhauls with TYCOM/ISIC<br />

• Prepare and submit overhaul progress reports<br />

• Ensure enough trained personnel are assigned<br />

to on-site monitoring of crafts and boats<br />

• Fulfill responsibilities for safety of craft and<br />

personnel<br />

VI-12.3.2.2 Degaussing • Maintain ship's installed degaussing system<br />

• Maintain ship's degaussing folder<br />

VI-12.4.1.2 Degaussing (Submarines<br />

• Ensure magnetic signature minimized by<br />

without degaussing systems)<br />

periodic check ranging<br />

• Inform ISIC of unsat ranging<br />

• Maintain ship's degaussing folder<br />

• Undergo flash deperming as directed<br />

• Before flash deperming prepare ship's<br />

equipment and off-load sensitive material<br />

VI-16.2.2.1.5 Habitability Improvement • Report deficiencies to TYCOM<br />

• Assign project manager and petty officer<br />

supervision<br />

• Assign labor force for removal, space<br />

preparation and installation<br />

• Conduct training programs<br />

• Accept delivery, store and account for<br />

materials<br />

• Maintain custody of tools for removal and<br />

installation<br />

• Report changes to Naval Inventory Control<br />

Point<br />

• Report completion to TYCOM<br />

• Ensure ship's selected records are updated

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!