COMFLTFORCOMINST 4790.3 REV A CH-6<br />

VI-19.2.1.3 Ship Maintenance and<br />

Material Management<br />

• Designate 3M Officer<br />

• Centralize maintenance management programs<br />

in the MDCO<br />

VI-23.3.1 Submarine Noise Reduction • Assign a Staff Noise Reduction Officer<br />

• Oversee and supervise Noise Reduction<br />

Program within Squadron<br />

• Submit requests for Beartrap Acoustic<br />

Radiated Trials<br />

• Schedule acoustic surveys during operating<br />

cycles of submarines<br />

• Recommend and/or authorize corrective<br />

actions<br />

• Review records, results, procedures and<br />

equipment during material readiness<br />

inspections<br />

• Schedule divers for underwater hull and<br />

propeller surveys<br />

• Report propeller replacements<br />

• Ensure support personnel trained in noise<br />

VI-24.7.3 Periodic Maintenance<br />

Requirement Program<br />

I-FWD-C-14<br />

reduction<br />

• Schedule and ensure completion of PMR work<br />

within planned periodicity in the CMP<br />

• Calldown all PMRs planned for<br />

accomplishment into the CSMP by availability<br />

dates<br />

• Conduct periodic audits of assigned FMAs<br />

• Maintain auditable records of PMR<br />

accomplishment for each submarine<br />

• Maintain automated database of Logistic Data<br />

System, Planned/Refit Maintenance<br />

Management System<br />

• Notify SUBMEPP representative at TYCOM<br />

of non-receipt of quarterly PMR Inventories<br />

and schedules<br />

• Contact SUBMEPP if a PMR has been<br />

completed prior to receipt of inventories and<br />

schedules<br />

• Keep local scheduling system correct and<br />

accurate<br />

• Ensure PMRs not completed by SUBMEPP<br />

due date are replanned<br />

• Ensure all "I"-level PMRs are scheduled for<br />

accomplishment by FMA prior to end of<br />

availability<br />

• Review completed AWRs prior to closeout<br />

• Transfer PMRs to other FMAs as necessary<br />

• Non-scheduled repairs of PMR components<br />

• Provide assigned ship's training in TYCOM<br />

PMR scheduling system