05.02.2013 Views

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX C<br />

I-4C-1<br />

COMFLTFORCOMINST 4790.3 REV A<br />

LISTING OF TESTS TO BE PERFORMED DURING<br />

NUCLEAR POWERED AIRCRAFT CARRIER BUILDER'S TRIALS<br />

1. The following systems and components will be tested during Nuclear Powered Aircraft Carrier Builder's Trials:<br />

a. Auxiliaries<br />

Emergency Diesel Generators<br />

O2N2 Plants (Forward and Aft)<br />

Steering Gears<br />

Motor Driven Fire Pumps and Eductors<br />

Anchor Windlass<br />

Stores Conveyors<br />

Hot Water Heaters<br />

HP Air Compressors<br />

Ship Service and Control Air Compressors<br />

Air Filter Cleaning<br />

Air Conditioning/Refrigeration Systems<br />

Turbine Generator and Diesel Generator (Load Transfer Operations)<br />

b. Aviation<br />

Aircraft Elevators 1, 2, 3, 4<br />

Aircraft Starting and Servicing Power<br />

Boat and Airplane Crane<br />

Flight Deck Night Lighting<br />

Arresting Gear<br />

Aircraft Barricade<br />

Jet Engine Test Facility<br />

Elevator Doors and Hangar Bay Division Doors<br />

Landing Officer's Console and Windscreen<br />

Visual Landing Aid<br />

Catapults (No Load Launching)<br />

Jet Blast Deflectors<br />

Integrated Catapult Control Stations<br />

Hangar Bay Darken Ship Switches<br />

JP-5 Filling, Transfer and Service System<br />

c. Combat Systems<br />

Upper Stage Weapons Elevators<br />

Flight Deck Hatches<br />

Magazine Sprinkling and Alarms<br />

Lower Stage Weapons Elevator 7 Hatches<br />

Inspect Masts

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!