APPENDIX C<br />

COMFLTFORCOMINST 4790.3 REV A<br />

SAMPLE PRE-REACTOR SAFEGUARD EXAMINATION NOTICE<br />

(Ship Name) NOTE 3540<br />

PCU (Ship Name and Hull No.) NOTICE 3540<br />

Subj: PRE-REACTOR SAFEGUARDS EXAMINATION (RSE)<br />

Encl: (1) Schedule of Examination<br />

(2) Officer Roster<br />

(3) Crew Roster<br />

(4) Initial Criticality and Power Range Testing Watchbill<br />

(5) Interview Schedule<br />

(6) ELT Evolution Schedule<br />

(7) Status of Propulsion Plant Systems and Spaces for Initial Criticality<br />

1. Purpose. To promulgate information pertinent to the conduct of the Pre-RSE.<br />

2. Discussion. A Pre-RSE is scheduled for PCU (Ship Name) on (Date). All examination activities will be<br />

conducted in the crew spaces in Building at Shipyard with the exception of observed drills and<br />

evolutions which are to be conducted onboard.<br />

3. Inspection Team Conference Rooms. The Wardroom in Building will be available for the private use of the<br />

Inspection Team throughout the examination. During the drill periods, the Wardroom aboard (Ship Name) will be<br />

available for use by the Inspection Team.<br />

4. Responsibilities.<br />

a. The Executive Officer is responsible for the overall coordination and execution of the examination per<br />

the schedule contained in enclosure (1). Crew members as designated by enclosures (2) and (3) will<br />

participate.<br />

b. Enclosure (4) provides the intended watchbill for manning watches throughout initial criticality<br />

preparations and power range testing.<br />

I-3C-1