23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 153<br />

<strong>FortisBC</strong> is unable to estimate impacts to Table 5.1.b without access to wholesale customer<br />

in<strong>for</strong>mation pertaining to:<br />

• Existing meter types and numbers <strong>of</strong> each<br />

• Geographical location <strong>of</strong> meters<br />

• Existing meter reading costs, and methodologies used<br />

• Measurement Canada compliance data<br />

• Current costs and staffing levels <strong>for</strong> contact centre, meter exchange,<br />

disconnect/reconnect processes, telecommunications and IT<br />

67.0 Reference: Project Costs and Benefits<br />

Exhibit B-1, Tab 5.0, Section 5.2.2, p. 75<br />

General Inflation Rate<br />

Page 75 <strong>of</strong> the <strong>Application</strong> notes that, “Inflation is estimated to be 1.8 percent over the<br />

20 year analysis period. This is based on a Conference Board <strong>of</strong> Canada Provincial<br />

<strong>for</strong>ecast dated April 19, 2012 <strong>of</strong> BC CPI <strong>for</strong> the period 2012 – 2016 inclusive.”<br />

67.1 For each <strong>of</strong> the exhibits listed below, please confirm if the figures included in<br />

each exhibit are presented in real or nominal dollars:<br />

• Table 5.1.a – AMI Project Capital Cost Summary (Exhibit B-1, Tab 5, p.<br />

70)<br />

• Table 5.1.b – Summary <strong>of</strong> All <strong>Inc</strong>remental Non-Project Costs and<br />

Benefits (Exhibit B-1, Tab 5, p. 72)<br />

• Table 5.3.1.b – Net Meter Reading Savings (Exhibit B-1, Tab 5, p. 80)<br />

• Table 5.3.2.e – Forecast Savings from Energy Theft Reduction (Exhibit B-<br />

1, Tab 5, p. 89)<br />

• Table 5.3.3.a – Forecast Savings from Remote Disconnects / Reconnects<br />

(Exhibit B-1, Tab 5, p. 91)<br />

• Table 5.3.4.a – Forecast Meter Replacement Savings (Exhibit B-1, Tab 5,<br />

p. 94)<br />

• Table 5.3.5.a – Forecast Meter Exchange Savings (Exhibit B-1, Tab 5, p.<br />

95)<br />

• Table 5.3.6.a – Forecast Savings from Contact Centre (Exhibit B-1, Tab<br />

5, p. 96)