23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 226<br />

The economic impact analysis should include only the expected annual cash<br />

inflows and outflows over the life <strong>of</strong> the project and should be prepared in<br />

accordance with the following guidelines:<br />

a) Categories:<br />

At a minimum, the economic impact analysis should be disaggregated into the<br />

following categories:<br />

Project Capital Costs<br />

• Third Party S<strong>of</strong>tware and Services<br />

• Meters (including deployment)<br />

• Network Infrastructure<br />

• System Integration<br />

• Theft Detection<br />

• Project Management<br />

• CPCN Development / Approval Costs<br />

• Capitalized Overhead<br />

• AFUDC<br />

• PST<br />

Sustaining Capital Costs<br />

• Meter Growth<br />

• Meter Replacement<br />

• Handheld Replacement<br />

• Measurement Canada Compliance<br />

• IT Hardware<br />

• Licensing<br />

• Support Costs<br />

Operating Costs<br />

• Meter Reading<br />

- Labour<br />

- Non-Labour