23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

Response:<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 276<br />

111.4.1 If yes, are there approaches to promote recharging <strong>of</strong> vehicles<br />

during <strong>of</strong>f-peak periods that do not require AMI infrastructure?<br />

Please describe.<br />

Technology available in today’s electric vehicle charging stations allows <strong>for</strong> “economy charging”<br />

without the assistance <strong>of</strong> AMI networks. If customers purchase charging stations with Time-<strong>of</strong>-<br />

Use metering installed on the EV circuit, the charging station can be configured to charge only<br />

when the power rates are at their lowest. Economy charging requires no action, other than<br />

plugging in the electric vehicle. At least two vendors <strong>of</strong>fer charging equipment with this<br />

functionality.<br />

112.0 Reference: Project Environment<br />

Response:<br />

Exhibit No. B-1, Tab 8.0, Section 8.1, p. 125<br />

Market Penetration in North America<br />

“According to a new report from Pike Research, unit shipments <strong>of</strong> smart meters in North<br />

America were 12.4 million in 2011 and will decline to 7.2 million by 2013, a 42% drop<br />

over just 2 years. After 2014, they will begin a gradual rise through the end <strong>of</strong> the<br />

decade.”<br />

112.1 Provide the current market penetration <strong>of</strong> smart meters in North America.<br />

According to Berg Insights (http://www.berginsight.com/ReportPDF/ProductSheet/bi-smseries2ps.pdf),<br />

“North America has the world’s highest penetration <strong>of</strong> automatic meter reading,<br />

exceeding 50 percent”.<br />

IDC Energy Insights (http://www.idc-ei.com/getdoc.jsp?containerId=prUS22778411 ) <strong>for</strong>ecasts<br />

that by 2015, North American smart meter deployments will reach 88 million, representing a<br />

penetration rate <strong>of</strong> 51.4%.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!