23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 200<br />

life <strong>of</strong> the project. Further, the in<strong>for</strong>mation <strong>FortisBC</strong> used to estimate the probable theft benefit<br />

related to AMI did not contemplate the adoption <strong>of</strong> LEDs by growers, as such a discussion <strong>of</strong><br />

possible ranges <strong>for</strong> low/high <strong>for</strong>ecasts is not possible. However, if it were possible that a<br />

marketable prototype were in use by up to two percent <strong>of</strong> growers beginning in 2017, the NPV<br />

<strong>of</strong> the Net Benefit presented in the <strong>Application</strong> declines to $32.9 million. Please see the<br />

responses to BCUC IR1 Q83.4.1 and Q87.2.4 <strong>for</strong> a detailed discussion on LED use in marijuana<br />

production. The supporting analysis is provided in the Electronic Attachment BCUC IR1 87.2.<br />

87.0 Reference: Project Costs and Benefits<br />

Exhibit B-1, Tab 5.0, Section 5.3.2, p. 84<br />

Energy Theft Reduction - Probable AMI Forecast<br />

<strong>FortisBC</strong> includes the following table on page 84 <strong>of</strong> the <strong>Application</strong>:<br />

87.1 Please state all assumptions used in this calculation <strong>of</strong> the NPV <strong>of</strong> Net Benefit <strong>of</strong><br />

$38 million in Table 5.3.2.b/