23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

<strong>FortisBC</strong>’s AMI consultant is Util-Assist <strong>Inc</strong> (http://www.util-assist.com/index.php).<br />

Response:<br />

Submission Date:<br />

October 5, 2012<br />

Page 83<br />

45.1.1 Provide a copy <strong>of</strong> the contract <strong>for</strong> the AMI consultant, confidentially if<br />

necessary.<br />

Due to contractual sensitivities, the attached has been filed in confidence with the Commission.<br />

46.0 Reference: Project Description<br />

Exhibit No. B-1, Tab 4.0, Section 4.3.5, pp. 59-60<br />

Risks and Cost Certainty<br />

46.1 Provide a risk evaluation in the following <strong>for</strong>mat <strong>for</strong> the risks already identified in<br />

Table 4.3.5.a – Overview <strong>of</strong> Risks and Solutions.<br />

Major Risks<br />

Key: Likelihood: 5 = Almost Certain 4 = Likely 3 = Possible 2 = Unlikely 1 = Rare<br />

Consequence: 5 = Catastrophic 4 = Major 3 = Moderate 2 = Minor 1 = Insignificant<br />

Risk Factor (List risk) Likelihood Consequence Risk Response Strategy<br />

•<br />

•<br />

•<br />

•<br />

15<br />

16<br />

17<br />

18<br />

Response:<br />

Please refer to the below table. Please refer to the response to BCUC IR1 Q46.2 <strong>for</strong> a<br />

discussion regarding the requested consequence levels and associated dollar impact.