23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 44<br />

Thus, the specific point <strong>of</strong> delivery/interconnection is not related to the meter location or its<br />

connections. For example, in cases <strong>of</strong> overhead residential services the conductors from the<br />

service mast are installed and maintained by the customer; however, in cases <strong>of</strong> underground<br />

services the service conductors are installed and maintained by the Company. In larger service<br />

installations (greater than 300 volts), a disconnecting switch is required ahead <strong>of</strong> the meter; this<br />

switch is installed and maintained by the customer. Thus in all three cases, the exact location<br />

where the utility service conductors connect to the customer equipment varies. In recognition <strong>of</strong><br />

these ongoing requirements, <strong>FortisBC</strong> does not expect to change the point <strong>of</strong> interconnection<br />

specified in its Electric Tariff.<br />

28.0 Reference: Project Description<br />

Response:<br />

Exhibit No. B-1, Tab 4.0, Section 4.1.1, pp. 44-45 and Appendix C-1,<br />

p. 39<br />

<strong>Inc</strong>entives<br />

28.1 Provide the anticipated costs <strong>of</strong> the customer incentive per device.<br />

Preliminary research indicated a price range <strong>of</strong> $80-$150 per In-Home Display (IHD) device.<br />

The approved 2012-13 DSM Plan includes a nominal $50 incentive or up to half the cost, <strong>of</strong><br />

eligible IHDs. The net Customer Portion <strong>of</strong> Cost would be $40-$100 <strong>of</strong> the price range indicated<br />

above.<br />

Response:<br />

28.1.1 How long does <strong>FortisBC</strong> require savings at 5.4 percent <strong>of</strong> annual energy<br />

use to fully <strong>of</strong>fset the customer incentive?<br />

The Total Resource Cost Benefit/Cost (B/C) ratio <strong>of</strong> an IHD measure is calculated as 1.6, based<br />

on a unit cost <strong>of</strong> $150. The Utility Cost Test B/C ratio is 4.2, with a simple payback <strong>of</strong> one year<br />

on the $50 incentive paid to a customer.<br />

The customer’s payback on their net IHD cost <strong>of</strong> $100 (after $50 DSM incentive) is<br />

approximately 1.5 years, assuming the average usage per customer (UPC).