23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

Response:<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 60<br />

33.2 Please explain where these costs are included in the financial analysis<br />

spreadsheet. If they are included in a specific line item, please separate out this<br />

cost on an annual basis.<br />

The post-AMI meter reading costs are noted starting in 2016 on line 47 (Meter Reading) on the<br />

“Gross AMI” sheet which is part <strong>of</strong> the spreadsheet in Exhibit B-3.<br />

For further detail, please see the response to BCUC IR1 Q33.1<br />

34.0 Reference: Project Description<br />

Response:<br />

Exhibit No. B-1, Tab 4.0, Section 4.1.4, pp. 49-50<br />

Main <strong>Application</strong>s<br />

34.1 What additional resources: hardware, s<strong>of</strong>tware, building space, equipment and<br />

staff, will be required to implement this collection engine application?<br />

The AMI system incorporates 18 VMS and 8 physical servers. Hardware will be supported with<br />

the current facility infrastructure and <strong>FortisBC</strong> anticipates using existing building space to house<br />

hardware and additional resources including equipment and staff. No additional hardware and<br />

s<strong>of</strong>tware is anticipated to be required other than that already included in the project costs.<br />

Response:<br />

34.2 What additional resources: hardware, s<strong>of</strong>tware, building space, equipment and<br />

staff, will be required to implement this reporting system application?<br />

Please see the response to BCUC IR1 Q34.1.<br />

Response:<br />

34.3 What additional resources: hardware, s<strong>of</strong>tware, building space, equipment and<br />

staff, will be required to implement this network management system application?