1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

Response:<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 168<br />

76.1.1 For each year between 2013 and 2032, please identify the estimated total<br />

system losses and estimated system losses due to theft included in the<br />

revenue requirement.<br />

The estimated system losses and the portion attributed to electric theft in both the Status Quo<br />

and AMI scenarios is presented in the table below.<br />

Table BCUC IR1 Q76.1.1<br />

2013 2014 2015 2016 2017 2018 2019<br />

Reported Estimated System Losses(MWhs) 320,512 326,788 332,545 336,688 340,846 345,539 350,086<br />

Status Quo Scenario<br />

Total estimated theft sites 218 231 244 257 270 276 281<br />

Annual Estimated losses per site(kWhs) 151,200 151,200 151,200 151,200 151,200 151,200 151,200<br />

System Losses due to Theft (MWhs) 33,032 34,939 36,884 38,869 40,893 41,710 42,545<br />

AMI Probable Scenario<br />

Total estimated theft sites 206 191 177 158 137 106 82<br />

Annual Estimated losses per site(kWhs) 151,200 151,200 151,200 151,200 151,200 151,200 151,200<br />

System Losses due to Theft (MWhs) 31,162 28,919 26,836 23,938 20,707 16,048 12,437<br />

2020 2021 2022 2023 2024 2025 2026<br />

Reported Estimated System Losses(MWhs) 354,687 359,574 364,470 369,158 374,079 378,976 383,850<br />

Status Quo Scenario<br />

Total estimated theft sites 287 293 299 305 311 317 323<br />

Annual Estimated losses per site(kWhs) 151,200 151,200 151,200 151,200 151,200 151,200 151,200<br />

System Losses due to Theft (MWhs) 43,395 44,263 45,149 46,052 46,973 47,912 48,870<br />

AMI Probable Scenario<br />

Total estimated theft sites 64 49 45 46 46 46 47<br />

Annual Estimated losses per site(kWhs) 151,200 151,200 151,200 151,200 151,200 151,200 151,200<br />

System Losses due to Theft (MWhs) 9,639 7,470 6,816 6,885 6,953 7,023 7,093<br />

2027 2028 2029 2030 2031 2032<br />

Reported Estimated System Losses(MWhs) 388,819 393,737 398,777 403,772 408,351 413,175<br />

Status Quo Scenario<br />

Total estimated theft sites 330 336 343 350 357 364<br />

Annual Estimated losses per site(kWhs) 151,200 151,200 151,200 151,200 151,200 151,200<br />

System Losses due to Theft (MWhs) 49,848 50,845 51,862 52,899 53,957 55,036<br />

AMI Probable Scenario<br />

Total estimated theft sites 47 48 48 49 49 50<br />

Annual Estimated losses per site(kWhs) 151,200 151,200 151,200 151,200 151,200 151,200<br />

System Losses due to Theft (MWhs) 7,164 7,236 7,308 7,381 7,455 7,529