23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 281<br />

The cost <strong>of</strong> integrating the proposed <strong>FortisBC</strong> HES to the <strong>FortisBC</strong> MDMS is estimated to be<br />

$2.0 million.<br />

Response:<br />

114.3 Please explain the difference, in cost, between connecting to the existing BC<br />

Hydro MDMS and the existing <strong>FortisBC</strong> HES as compared to connecting the<br />

proposed <strong>FortisBC</strong> MDMS to the proposed <strong>FortisBC</strong> HES.<br />

Please refer to the response to BCUC IR1 Q114.1.<br />

Response:<br />

114.4 Please explain further the integration <strong>of</strong> the MDMS and the billing system.<br />

Specifically, explain how the existing <strong>FortisBC</strong> billing system differs from the<br />

existing BC Hydro billing system, in terms <strong>of</strong> the difference in the data to be<br />

provided by the MDMS to the billing system.<br />

Please refer to the response to BCUC IR1 Q114.1.<br />

Response:<br />

114.5 Please provide the anticipated costs <strong>for</strong> connecting the proposed <strong>FortisBC</strong><br />

MDMS to the <strong>FortisBC</strong> billing system.<br />

The cost <strong>of</strong> integrating the proposed <strong>FortisBC</strong> MDMS to the <strong>FortisBC</strong> billing system is estimated<br />

to be $2.1 million.<br />

Response:<br />

114.6 Please explain the difference, in cost, between connecting to the existing BC<br />

Hydro MDMS and the existing <strong>FortisBC</strong> billing system as compared to<br />

connecting the proposed <strong>FortisBC</strong> MDMS to the existing <strong>FortisBC</strong> billing system.<br />

Please refer to the response to BCUC IR1 Q114.1.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!