23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

2013<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

Advanced Metering<br />

Infrastructure (AMI)<br />

2015<br />

Supervisory Control and<br />

Data Acquisition (SCADA)<br />

Already<br />

deployed<br />

Scheduled<br />

Start<br />

Legend<br />

Task / Technology<br />

Scheduled<br />

Finish<br />

Actual Start Actual Finish<br />

Wide‐area (wireless)<br />

communications networks<br />

2013<br />

2015<br />

Fibre‐Optic<br />

Communications Networks<br />

Already<br />

deployed<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

BCUC IR1 Figure 44.2<br />

Meter Data Management<br />

System (MDMS)<br />

2013<br />

2015<br />

Distribution Management<br />

System (DMS)<br />

No identified<br />

need<br />

Phasor Measurement Units<br />

(PMU)<br />

Already<br />

deployed<br />

Substation Automation<br />

Already<br />

deployed<br />

Real‐time trans<strong>for</strong>mer<br />

monitoring<br />

Already<br />

deployed<br />

Real‐time transmission line<br />

rating<br />

No identified<br />

need<br />

Not required<br />

45.0 Reference: Project Description<br />

Response:<br />

<strong>FortisBC</strong> Smart Grid Components ‐ PERT Chart<br />

Energy Management<br />

System (EMS)<br />

Distribution Automation<br />

(DA)<br />

Unknown<br />

In‐Home Displays (IHD)<br />

2013<br />

2013<br />

Unknown<br />

2015<br />

Customer In<strong>for</strong>mation<br />

Portal<br />

2016<br />

2015<br />

Outage Management<br />

System (OMS)<br />

Exhibit No. B-1, Tab 4.0, Section 4.3.3, pp. 59-60<br />

Project Manager Responsible<br />

45.1 Who is the AMI consultant?<br />

2016<br />

Demand Response control<br />

(DR)<br />

No identified<br />

Unknown<br />

need<br />

Electric (EV or PHEV)<br />

vehicle integration<br />

Customer<br />

Unknown<br />

driven<br />

Distributed Generation<br />

Integration (DG)<br />

Customer<br />

Unknown<br />

driven<br />

Conservation Voltage<br />

Reduction (CVR)<br />

No identified<br />

Unknown<br />

need<br />

Automatic Vehicle Location<br />

(AVL)<br />

Already<br />

deployed<br />

Computerized Maintenance<br />

Management System (CMMS)<br />

Already<br />

deployed<br />

Cyber‐Security<br />

Infrastructure<br />

Already<br />

deployed<br />

Dispatch System<br />

Already<br />

deployed<br />

Work Management System<br />

(WMS)<br />

No identified<br />

need<br />

Submission Date:<br />

October 5, 2012<br />