23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 90<br />

over-voltage. The meter would then become non-functional until the fuse is repaired by the<br />

manufacturer.<br />

48.0 Reference: Project Costs and Benefits<br />

Response:<br />

Exhibit B-3, Excel Document: “<strong>FortisBC</strong> – AMI Excel NPV Analysis –<br />

17Aug12”<br />

Costs per Meter<br />

48.1 Please complete the attached table and provide a working Excel copy <strong>for</strong> each <strong>of</strong><br />

the following tabs in Exhibit B-3:<br />

• Gross AMI<br />

• Status Quo<br />

• Gross PLC<br />

• Gross AMR<br />

Please see the following table. Please also refer to Electronic Attachment BCUC IR1 48.1.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!