23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

12.0 Reference: Project Need<br />

Response:<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Exhibit No. B-1, Tab 3.0, Section 3.2.3, pp. 25-29<br />

Smart Grid Vision<br />

Submission Date:<br />

October 5, 2012<br />

Page 24<br />

12.1 Provide the actual cost <strong>of</strong> the Supervisory Control and Data Acquisition (SCADA)<br />

systems.<br />

The <strong>FortisBC</strong> SCADA system was first installed in 1988 and underwent major upgrades in 1998<br />

and 2007. Due to the passage <strong>of</strong> time, there is very limited cost in<strong>for</strong>mation available <strong>for</strong> the<br />

1988 and 1998 installations. <strong>FortisBC</strong> would estimate the total costs <strong>of</strong> the initial SCADA system<br />

installation and the upgrades since that time as being approximately $1 to $2 Million. Note that<br />

this does not include any associated infrastructure costs <strong>for</strong> the System Control Centre building<br />

(which houses the SCADA hardware and associated operating personnel). Nor does it include<br />

the costs <strong>of</strong> the field hardware and communications systems necessary needed to support the<br />

SCADA system. These latter costs have been included in the sustaining and growth capital<br />

projects completed over the years and separating out the costs would be very difficult.<br />

Response:<br />

12.2 Provide the actual cost <strong>of</strong> the Distribution Substation Automation Program<br />

(DSAP).<br />

The Distribution Substation Automation Program was completed in 2012 at an actual cost <strong>of</strong><br />

$6.747 million (inclusive <strong>of</strong> salvage).