23.03.2013 Views

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

FortisBC Inc. (FortisBC) Application for a Certificate of Public ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

<strong>FortisBC</strong> <strong>Inc</strong>. (<strong>FortisBC</strong> or the Company)<br />

<strong>Application</strong> <strong>for</strong> a <strong>Certificate</strong> <strong>of</strong> <strong>Public</strong> Convenience and Necessity<br />

<strong>for</strong> the Advanced Metering Infrastructure Project<br />

Response to British Columbia Utilities Commission (BCUC or the Commission)<br />

In<strong>for</strong>mation Request (IR) No. 1<br />

Submission Date:<br />

October 5, 2012<br />

Page 166<br />

2. Marihuana Growth in British Columbia, <strong>Public</strong> Policy Paper Number 74 by<br />

Stephen T. Easton provided as Appendix BCUC IR1 74.1.<br />

75.0 Reference: Project Costs and Benefits<br />

Response:<br />

Exhibit No. B-1, Tab 5.0, Section 5.3.2, pp. 80-83<br />

Marijuana Grow Operations and Table 5.3.2.a – Key Assumptions<br />

75.1 How many <strong>FortisBC</strong> residential accounts constantly consume greater than 93<br />

kWh/day?<br />

683 residential accounts have used greater than 93 kWh/day every billing period since<br />

September 2010.<br />

Response:<br />

75.2 As the Grow Ops are currently experimenting and using LED lighting and CFLs,<br />

please provide an updated Table 5.3.2.a – Key Assumptions, showing the<br />

impact <strong>of</strong> LEDs and CFLs on the electricity theft, cost/benefit and NPV<br />

calculations.<br />

<strong>FortisBC</strong> does not contemplate a conversion to LED technology by marijuana producers during<br />

the life <strong>of</strong> the project. Please refer to BCUC IR1 Q84.3.1 <strong>for</strong> a discussion on LED lighting in<br />

marijuana production. However, should such technology become viable the potential impact on<br />

the NPV <strong>of</strong> Net Benefit is presented in the supporting analysis provided as Electronic<br />

Attachment BCUC IR1 87.2, tab 83.4.1. All assumptions remain unchanged except that LED<br />

technology at 70 percent efficiency is assumed beginning in 2017 at a rate <strong>of</strong> 2 percent in both<br />

the Status Quo and AMI Probable scenarios. This percentage increases annually by 2 percent<br />

<strong>for</strong> the remaining analysis life <strong>of</strong> the project.