Evaluation of Opportunities for Converting Indigenous UK Wastes <strong>to</strong> Wastes and Energy<br />

AEA/ED45551/Issue 1<br />

site at Hartshill, near Nunea<strong>to</strong>n. Asda is using a similar programme for 20 of its s<strong>to</strong>res, sending some<br />

waste <strong>to</strong> Veolia’s CHP site in Sheffield (included in Table 56 above).<br />

PDM have also received planning permission for a £25 million 150,000 <strong>to</strong>nnes per annum biomass plant<br />

close <strong>to</strong> <strong>the</strong> above facility in Widnes.<br />

8.2.3 Utilising Wood - C&D Waste, Sawmill products, Forestry Residues<br />

Utilising forestry residues is largely carried out on a local scale, with clean wood being used in small scale<br />

biomass boilers.<br />

In <strong>the</strong> UK a significant amount of waste wood is used within <strong>the</strong> wood working industry. For example,<br />

wood waste may be used at furniture manufacturing sites <strong>to</strong> generate process heat. The level of<br />

utilisation of such a resource is unpublished, but it has been estimated that <strong>the</strong>re are at least 275 smallscale<br />

wood-burning boilers in <strong>the</strong> UK (0.4 – 3MW), consuming 223,500 <strong>to</strong>nnes of wood each year in <strong>the</strong><br />

furniture industry. 208 Such figures do not include throughputs for <strong>the</strong> larger scale boilers used <strong>by</strong> <strong>the</strong><br />

panel board manufacturing industry.<br />

One instance of waste wood being processed for utilisation is <strong>by</strong> Wood Pellet Energy Ltd in County<br />

Durham, which collects wood waste from business and households in <strong>the</strong> region. They convert wood<br />

waste, which would o<strong>the</strong>rwise go <strong>to</strong> board manufacturing, <strong>to</strong> fuel pellets. Annual production is<br />

approximately 12,000 <strong>to</strong>nnes, with output expected <strong>to</strong> rise. The pellets produced from ‘clean’ waste wood<br />

are <strong>the</strong>n used <strong>by</strong> Durham County Council <strong>to</strong> heat twelve of its schools, schools in Northumberland and<br />

North Yorkshire and parts of Leeds University. Pellets that have been produced from treated wood can<br />

only be used in boilers that are WID compliant such as at Sembcorp Biomass Power Station at Teesside.<br />

E.ON received permission in 2008 <strong>to</strong> build an energy plant at Blackburn Meadows in Sheffield, that uses<br />

recycled wood as <strong>the</strong> fuel source. Construction is expected <strong>to</strong> begin in 2009, with <strong>full</strong> commercial<br />

operation expected in 2011. It is intended <strong>to</strong> generate 25 MW of electricity. 209<br />

Table 57 Wood utilising energy generation systems<br />

Site and<br />

Opera<strong>to</strong>r<br />

Port Talbot<br />

biomass<br />

power station<br />

Eccleshall<br />

Biomass<br />

energy<br />

RSPB Old<br />

Moor<br />

Sheffield<br />

Road Flats<br />

(166 flats),<br />

Barnsley<br />

Metropolitan<br />

Borough<br />

Council<br />

Location Quantity of Wood Generation<br />

Capacity<br />

Port Talbot,<br />

South Wales<br />

120k <strong>to</strong>nnes forestry and<br />

sawmill residues.<br />

13.5MWe<br />

Electricity<br />

only<br />

Staffordshire 20k <strong>to</strong>nnes wood chip and<br />

miscanthus<br />

2.3MWe<br />

South Yorkshire 3 <strong>to</strong>nnes of fuel (12m 3 )<br />

delivered twice per week<br />

during winter, once every<br />

two weeks during <strong>the</strong><br />

summer.<br />

Barnsley 100m 3 of fuel gives 1 weeks<br />

supply in winter and 3 <strong>to</strong> 4<br />

weeks in summer.<br />

208 Benchmarking wood waste combustion, BFM, 2005,<br />

http://www.bfmenvironment.co.uk/images/BFM%20Wood%20combustion%20benchmarking%20-%20<strong>full</strong>1.pdf<br />

209 E.ON, Blackburn Meadows, http://www.eon-uk.com/generation/1490.aspx<br />

100kW<br />

Heating<br />

1 x 320 kW<br />

and 1 x 150<br />

kW<br />

providing<br />

space and<br />

water<br />

heating<br />

Operational<br />

2008<br />

2007<br />

2004<br />

2004<br />