20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Creek diversion dam can come from a 12-inch diameter pipe with a maximum capacity of<br />

2 cfs and a 36-inch-diameter pipe with a maximum capacity of 100 cfs. Controlled<br />

releases from the South <strong>Fork</strong> Long Canyon Creek diversion dam can come from a 12inch<br />

diameter pipe with a maximum capacity of about 5 cfs and a 36-inch-diameter pipe<br />

with a maximum capacity of 140 cfs. During the winter and spring period, accretion<br />

occurs along the Long Canyon Creek (downstream of North and South <strong>Fork</strong> diversions)<br />

and in the Duncan Creek bypassed reaches and creates relatively natural shaped<br />

hydrographs in the lower portions of the reaches. The diversions are not operated during<br />

the late summer and fall season (typically August through November) due to low inflow<br />

and minimum instream flow requirements (table 3.3.2-4). Therefore, all inflows to the<br />

diversion pools are passed downstream into the bypassed reaches.<br />

Table 3.3.2-4. Minimum stream maintenance flow requirements (Source: PCWA,<br />

2007b, table Supporting Document B-9, as modified by staff).<br />

Facility License Requirement<br />

Duncan<br />

Creek<br />

diversion dam<br />

French<br />

Meadows<br />

dam<br />

Hell Hole<br />

dam<br />

Forecast/Folsom reservoir a<br />

> 1,000,000 acre-feet<br />

< 1,000,000 acre-feet<br />

Beginning of operations to March 17, 1981:<br />

Forecast/Folsom reservoir a<br />

> 1,000,000 acre-feet<br />

< 1,000,000 acre-feet<br />

75<br />

Release (cfs)<br />

Lesser of 8 or natural flow<br />

Lesser of 4 or natural flow<br />

Release (cfs)<br />

8 at all times<br />

except that total releases shall not<br />

exceed 5,800 acre-feet<br />

4 at all times<br />

except that total releases shall not<br />

exceed 2,900 acre-feet<br />

March 18, 1981, and thereafter: no limitation of total release<br />

Beginning of operations to March 17, 1981:<br />

Forecast/Folsom reservoir a<br />

Release (cfs)<br />

> 1,000,000 acre-feet<br />

20 June 1–July 25<br />

15 July 26–August 5<br />

10 August 6–Oct 31<br />

14 Nov 1–Jan 31<br />

20 Feb 1–May 31<br />

except that total releases shall not<br />

exceed 11,000 acre-feet<br />

< 1,000,000 acre-feet<br />

8 June 1–Dec 1<br />

6 Jan 1–March 25<br />

8 March 26–May 31<br />

except that total releases shall not<br />

exceed 5,500 acre-feet