294<br />

Enhancement/Mitigation<br />

Measures Entities<br />

32. Replace recycling containers<br />

(within 5 years), drill well and<br />

replace water storage tank, supply<br />

and distribution lines at <strong>Middle</strong><br />

Meadows Campground (within 6<br />

years)<br />

33a. Formalize the Ralston<br />

Afterbay Sediment Access Point<br />

Boat Ramp and parking area, and<br />

install signage, within 2 years<br />

33b. Formalize the Ralston<br />

Afterbay Sediment Access Point<br />

Boat Ramp and parking area, and<br />

install signage, within 5 years (to be<br />

implemented after the first sediment<br />

removal)<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

PCWA, staff $0 $0 $0 g<br />

PCWA $7,870 $1,570 $2,200 c<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$21,480 $1,500 $3,290 d