20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

class IV boating opportunities in the peaking reach, and table 3.3.5-12 shows the flows<br />

specified for providing class II boating on the Confluence Run.<br />

Table 3.3.5-11. Flow schedule provided in Forest Service condition no. 39 to support<br />

class IV boating opportunities on the peaking reach downstream of<br />

Oxbow powerhouse (Source: Forest Service, 2011).<br />

Water<br />

Year Type<br />

Flow a<br />

(cfs)<br />

Duration<br />

(Time of day)<br />

Weekdays June 1–Labor Day<br />

Wet 1,000 3 hours<br />

(9 a.m.–noon)<br />

Above<br />

normal<br />

Below<br />

normal<br />

1,000 3 hours<br />

(9 a.m.–noon)<br />

1,000 3 hours<br />

(9 a.m.–noon)<br />

Dry 1,000 3 hours<br />

(8 a.m.–11 a.m.)<br />

Critical 1,000 3 hours<br />

(8 a.m.–11 a.m.)<br />

Extremely<br />

critical<br />

Weekends<br />

1,000 3 hours<br />

(8 a.m.–11 a.m.)<br />

Wet 1,000 4 hours<br />

(8 a.m.–noon)<br />

Above<br />

normal<br />

Below<br />

normal<br />

1,000 4 hours<br />

(8 a.m.–noon)<br />

1,000 4 hours<br />

(8 a.m.–noon)<br />

238<br />

5 days per week<br />

(M–F)<br />

5 days per week<br />

(M–F)<br />

4 days per week<br />

(T–F)<br />

3 days per week<br />

(T, W, F) except for<br />

F before Labor Day<br />

2 days per week<br />

(W, F) except for<br />

Memorial Day b<br />

1 day per week<br />

(W)<br />

Saturday before<br />

Memorial Day–<br />

Labor Day<br />

After Labor Day–<br />

September 30<br />

4 days per week<br />

(T–F)<br />

3 days per week<br />

(T, W, F)<br />

3 days per week<br />

(T, W, F)<br />

2 days per week<br />

(W, F)<br />

--<br />

--<br />

After Labor Day–<br />

September 30<br />

Saturdays, Sundays Saturdays, Sundays<br />

Saturdays, Sundays Saturdays, Sundays<br />

Saturdays except<br />

for Western States<br />

100 date<br />

Saturdays, Sundays