18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

the species; (b) if new occurrences of Forest Service special status plants or<br />

wildlife are detected prior to or during project construction, operation, or<br />

maintenance, notify the Forest Service and, as appropriate, FWS and California<br />

Fish and Game, and implement appropriate protection measures; (c) any<br />

replacement of existing powerline poles would be conducted in accordance<br />

with Suggested Practices for Avian Protection on Power Lines: the State of the<br />

Art in 2006; (d) conduct a survey of newly installed project power poles to<br />

determine their consistency with the current avian protection guidelines and<br />

provide a summary of findings to the Forest Service, FWS, and California Fish<br />

and Game and replace non-compliant poles within 15 years of license issuance;<br />

and (e) implement the proposed Bald Eagle Management Plan.<br />

• Condition no. 28: Finalize the following proposed monitoring plans: Fish<br />

Population; Foothill Yellow-legged Frog; Western Pond Turtle; Benthic<br />

Macroinvertebrate, Mercury Bioaccumulation; Geomorphology and Riparian;<br />

and Water Quality. Develop, in consultation with the Forest Service and<br />

California Fish and Game, a Bear Management Monitoring Plan.<br />

• Condition no. 29: Develop, in consultation with the Forest Service, California<br />

Fish and Game, and the Water Board a large woody debris (LWD)<br />

management plan.<br />

• Condition no. 30: Each year prior to May 15, facilitate a meeting with the<br />

Forest Service, California Fish and Game, and the Water Board to discuss the<br />

results of implementing streamflow and reservoir-related conditions, results of<br />

monitoring, and other issues related to preserving and protecting the ecological<br />

values affected by the project. Make available to the agencies 2 weeks prior to<br />

the meeting an operations and maintenance plan for the year in which the<br />

meeting occurs.<br />

• Condition no. 31: Finalize the Streamflow and Reservoir Elevation Gaging<br />

Plan.<br />

• Condition no. 32: Develop a plan to evaluate penstock and other drainage<br />

structure emergency and maintenance release point to determine if<br />

improvements can be made to minimize potential adverse water quality effects<br />

when the release points are used and if so, the protocols that would be used.<br />

• Condition no. 33: Implement the Alternative 1 Recreation Plan.<br />

• Condition no. 34: Enter into a collection agreement to provide annual funding<br />

to the Forest Service to provide operation, maintenance, and administration in<br />

accordance with the Recreation Plan.<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!