18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

• Implement the Alternative 1 minimum water surface elevations shown in table<br />

5-7 of this <strong>EIS</strong>.<br />

• Implement the Alternative 1 Streamflow and Reservoir Elevation Gaging Plan<br />

with the exception of installing and operating a new gage on the North <strong>Fork</strong><br />

<strong>American</strong> <strong>River</strong> and two new gages on the lower end of the Rubicon <strong>River</strong>.<br />

• Develop a spawning habitat improvement plan for the <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong><br />

<strong>River</strong> downstream of Ralston afterbay dam.<br />

• Implement the Fish Population Monitoring Plan with the exception of proposed<br />

hardhead monitoring.<br />

• File annual reports regarding the status of restoration of California Central<br />

Valley steelhead in the <strong>American</strong> <strong>River</strong> watershed with the Commission.<br />

• Implement the Alternative 1 Vegetation and Integrated Pest Management Plan.<br />

• Expand the area proposed for survey of special status plants in the Vegetation<br />

and Integrated Pest Management Plan to include a portion of the French<br />

Meadows Campground Water Supply Facility access road.<br />

• Expand the scope of the proposed preconstruction raptor nest surveys within<br />

500 feet of construction activities to include observations of special status<br />

wildlife.<br />

• Revise the Alternative 1 Recreation Plan consistent with the staff alternative,<br />

and file for Commission approval. The revised plan should:<br />

Include provisions to replace the water system infrastructure and access<br />

roads associated with the French Meadows North water system as<br />

necessary to provide water to Lewis campground; Gates group<br />

campground, Coyote group campground; McGuire picnic area; McGuire<br />

boat ramp; and French Meadows recreational vehicle (RV) dump station<br />

within 9 years;<br />

Reflect PCWA’s responsibility to operate and maintain the project<br />

recreation facilities without funding law enforcement;<br />

Include provisions to provide recreation opportunity marketing materials<br />

(maps and brochures). PCWA would develop the maps and brochures, and<br />

provide an electronic copy to the agencies for their own use;<br />

Include provisions to revise and update the recreation maps and brochures<br />

once every 6 years;<br />

Present geographically organized descriptions of all project recreation<br />

facilities;<br />

Provide a comprehensive description of all existing and proposed<br />

improvements and amenities at each project facility (i.e., do not present<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!