18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

287<br />

Enhancement/Mitigation<br />

Measures Entities<br />

11a. Extend Poppy Trail to the<br />

McGuire Boat Ramp Parking Area<br />

within 4 years.<br />

11b. Extend Poppy Trail (Forest<br />

16E10) to the McGuire Boat Ramp<br />

Parking Area and reconstruct this<br />

trail to Poppy Campground within<br />

13 years<br />

12a. Maintain French Meadows<br />

Campground at a 75-site capacity,<br />

replace restrooms, and upgrade<br />

certain site components within 2 to<br />

6 years<br />

12b. Reduce the French Meadows<br />

Campground from 75 to 70 sites<br />

with 6 sites converted to 3 double<br />

sites, and redesign and reconstruct<br />

within 5 years<br />

13. Reconstruct the French<br />

Meadows RV dump station within<br />

4 years<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$26,230 $0 $2,100 d<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$786,850 $0 $63,020 d<br />

$17,730 $0 $1,420 d

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!