20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Table 3.3.2-2. Minimum pool requirements (Source: PCWA, 2007b, as modified by<br />

staff).<br />

Facility License Requirement<br />

French<br />

Meadows<br />

reservoir<br />

Hell Hole<br />

reservoir<br />

Forecast/Folsom reservoir a<br />

> 2,000,000 acre-feet<br />

1,200,000–2,000,000 acre-feet<br />

< 1,200,000 acre-feet<br />

The spillway gates (Tainter gates) must<br />

remain open from Nov. 15 to April 1 of<br />

each year.<br />

Forecast/Folsom reservoir a<br />

> 2,000,000 acre-feet<br />

1,200,000–2,000,000 acre-feet<br />

< 1,200,000 acre-feet<br />

65<br />

Minimum Pool (acre-feet)<br />

June–Sept Oct–May<br />

60,000 50,000<br />

60,000 25,000<br />

28,000 8,700<br />

Minimum Pool (acre-feet)<br />

June–Sept Oct–May<br />

70,000 50,000<br />

70,000 25,000<br />

26,000 5,500<br />

Duncan Creek Maintain water surface elevation at 5,259 feet.<br />

diversion pool<br />

a<br />

Forecast / Folsom reservoir = California DWR current year forecast of unimpeded<br />

run-off of the <strong>American</strong> <strong>River</strong> to Folsom reservoir.