18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Proposed Recreation Plan Alternative 1 Recreation Plan<br />

McGuire Picnic Area and Beach<br />

Convert picnic area to group<br />

campground with 2 25-PAOT sites<br />

within 4 years.<br />

217<br />

Convert picnic area to group<br />

campground with 1 25-PAOT and 1<br />

50-PAOT site within 9 years.<br />

French Meadows RV Dump Station<br />

No comparable measure in this plan. Reconstruct the station within 4 years.<br />

French Meadows North and South Shore Water Supplies<br />

Replace all water system infrastructure<br />

at French Meadows North and South<br />

water systems within 3 and 6 years,<br />

respectively.<br />

Replace all water system infrastructure<br />

and access roads at French Meadows<br />

North and South water systems within<br />

9 and 5 years, respectively.<br />

Upper Hell Hole Campground<br />

Remove within 2 years Remove within 7 years.<br />

Hell Hole Campground<br />

Reduce from 10 sites to 8 sites within 2<br />

years.<br />

Remove or potentially replace water<br />

distribution lines.<br />

Big Meadows Campground<br />

Install loop gates, replace 1 restroom.<br />

Drill well, install water supply lines<br />

supply and connect to existing<br />

distribution lines within 2 years.<br />

<strong>Middle</strong> Meadows Campground<br />

Replace recycling containers (within 5<br />

years). Drill well and replace water<br />

storage tank, supply and distribution<br />

lines (within 6 years).<br />

Hell Hole Boat Ramp and Parking Area<br />

Install barrier rock at lower parking<br />

area within 2 years.<br />

Potentially convert to group site or<br />

reduce from 10 sites to 7 sites within 9<br />

years.<br />

Provide reliable and adequate potable<br />

water source and delivery system.<br />

Construct information kiosks, level<br />

some sites and replace some site<br />

components.<br />

No comparable measure in this plan.<br />

Restore areas removed from parking<br />

area when it was reduced in size, chip<br />

seal, replace fencing within 7 years.<br />

No comparable measure in this plan. Provide potable water within 5 years.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!