18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Location<br />

South <strong>Fork</strong> Long<br />

Canyon Creek<br />

below South <strong>Fork</strong><br />

Long Canyon<br />

diversion dam<br />

Water Year Type<br />

Wet<br />

May 13<br />

(May 27)<br />

May 16<br />

(May 30)<br />

May 1<br />

(May 15)<br />

May 2<br />

(May 16)<br />

May 11<br />

(May 25)<br />

May 13<br />

(May 27)<br />

May 16<br />

(May 30)<br />

Above<br />

Normal<br />

56<br />

Action<br />

May 6 Reduce the flow to a minimum of 21 cfs or inflow,<br />

whichever is less<br />

May 9 Release the minimum instream flow requirement<br />

May 1 Release a minimum of 100 cfs or inflow, whichever<br />

is less<br />

May 2 Close diversion completely<br />

May 4<br />

Release a minimum of 70 cfs or inflow, whichever is<br />

less (can reopen diversion)<br />

May 6<br />

Reduce the flow to a minimum of 35 cfs or inflow,<br />

whichever is less<br />

May 9 Release the minimum instream flow requirement<br />

Table 3.3.1-3. Proposed and Alternative 1 implementation schedule of pulse flows and<br />

flow measurement locations. Note: Year 1 begins 30 days after license<br />

issuance (Source: PCWA, 2011a, and 2011b, as modified by staff).<br />

<strong>Project</strong> Location<br />

Duncan Creek below<br />

Duncan diversion dam<br />

<strong>Middle</strong> <strong>Fork</strong> <strong>American</strong><br />

<strong>River</strong> below French<br />

Meadows dam<br />

<strong>Middle</strong> <strong>Fork</strong> <strong>American</strong><br />

<strong>River</strong> below <strong>Middle</strong> <strong>Fork</strong><br />

interbay dam<br />

Rubicon <strong>River</strong> below Hell<br />

Hole reservoir dam<br />

Beginning Year<br />

following License<br />

Issuance<br />

Proposed<br />

Action<br />

Alternative<br />

1<br />

Year 4 Year 4<br />

Year 3 Year 1<br />

Year 3 Year 3<br />

Year 6 Year 6<br />

Measurement Location<br />

USGS gage no. 11427750 and a<br />

new gage on Duncan Creek<br />

diversion tunnel<br />

USGS gage no. 11427500 and a<br />

new gage at French Meadows<br />

dam<br />

A new gage in the <strong>Middle</strong> <strong>Fork</strong><br />

<strong>American</strong> <strong>River</strong> below interbay<br />

dam<br />

USGS gage no. 11428800 and<br />

new gages in the Rubicon <strong>River</strong><br />

below Hell Hole reservoir dam

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!