18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

289<br />

Enhancement/Mitigation<br />

Measures Entities<br />

17a. Replace all of the water<br />

system infrastructure at the French<br />

Meadows North water system<br />

(Dolly Creek Water Supply) within<br />

3 years<br />

17b. Replace all of the water<br />

system infrastructure and access<br />

roads at the French Meadows North<br />

water system (Dolly Creek Water<br />

Supply) within 9 years<br />

17c. Replace the water system<br />

infrastructure and access roads<br />

associated with the French<br />

Meadows North water system only<br />

as necessary to provide water to<br />

Lewis campground; Gates group<br />

campground; Coyote group<br />

campground; McGuire picnic area;<br />

McGuire boat ramp; and French<br />

Meadows RV dump station within<br />

9 years<br />

18a. Replace all of the water<br />

system infrastructure at the French<br />

Meadows South water system<br />

within 6 years<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game (Alternative 1)<br />

$78,680 $0 $3,150 e<br />

Staff $39,340 $0 $2,770 e<br />

PCWA $0 $0 $0 g

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!