20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

• Condition no. 35: Enter into a collection agreement with the Forest Service to<br />

provide funding on a one-time basis for design, construction, and installation<br />

of a toilet facility and information kiosk at the Cache Rock site on the peaking<br />

reach.<br />

• Condition no. 36: Provide a shared purpose work station and storage facility to<br />

serve the Hell Hole recreation area; the size, location, and required<br />

improvements for this facility to be determined through agreement with the<br />

Forest Service.<br />

• Condition no. 37: Implement the Alternative 1 minimum water surface<br />

elevations shown in table 5-7 and the reservoir level recreation objectives<br />

shown in table 3.3.5-8 of this <strong>EIS</strong>.<br />

• Condition no. 38: Implement the reservoir fish stocking program described in<br />

the Alternative 1 Recreation Plan.<br />

• Condition no. 39: Implement the Alternative 1 whitewater boating flows<br />

shown in tables 5-5 and 5-6 of this <strong>EIS</strong>.<br />

• Condition no. 40: Implement the Alternative 1 Visual Resource Management<br />

Plan.<br />

• Condition no. 41: Finalize the Historic Properties Management Plan.<br />

• Condition no. 42: If prior to or during project-related ground-disturbing<br />

activities cultural resources are reported or discovered, PCWA would<br />

immediately cease work, notify the Forest Service, and not resume work on<br />

ground-disturbing activities until it receives written approval from the Forest<br />

Service.<br />

• Condition no. 43: Finalize the Transportation System Management Plan.<br />

• Condition no. 44: Finalize the Fire Management and Response Plan.<br />

• Condition no. 45: Develop an erosion and sediment control management plan<br />

that includes at a minimum: (a) the proposed Sediment Management Plan;<br />

(b) erosion control guidelines for existing project-affected areas; and<br />

(c) erosion control guidelines for new construction or non-routine maintenance.<br />

• Condition no. 46: Finalize the Vegetation and Integrated Pest Management<br />

Plan.<br />

2.3 ALTERNATIVE 1<br />

On November 30, 2011, PCWA submitted a supplemental filing that includes a<br />

description and analysis of an alternative (Alternative 1) to its proposed action. The<br />

filing augmented information in the license application but PCWA indicated that this<br />

alternative did not replace its proposed action. PCWA developed Alternative 1 after<br />

29