18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

PCWA Recreation Plan Alternative 1 Recreation Plan<br />

Fish Stocking<br />

Plant or reimburse California Fish and<br />

Game for planting in Hell Hole and<br />

French Meadows reservoirs 50% of<br />

California Fish and Game annual<br />

management target or 50% of historical<br />

average stocked 2001-2009, whichever<br />

is less.<br />

232<br />

Plant or reimburse California Fish and<br />

Game for planting in Hell Hole and<br />

French Meadows reservoirs 100% of<br />

California Fish and Game annual<br />

management target or 100% of<br />

historical average 2001-2009,<br />

whichever is less.<br />

Public Information About Operations Schedule<br />

No comparable measure proposed. Post outage schedule for <strong>Middle</strong> <strong>Fork</strong>,<br />

Ralston, and Oxbow powerhouses by<br />

May 1 and final schedule by<br />

September 1.<br />

No comparable measure proposed. Post 24-hour predicted flows from<br />

Oxbow powerhouse based on predicted<br />

operation using California Independent<br />

System Operator schedule.<br />

Threshold for New or Expanded Recreation Facilities<br />

If occupancy data reaches 75% on<br />

weekends at any recreation facility,<br />

initiate second year of monitoring. If<br />

second year monitoring reaches 75%,<br />

initiate a third year of monitoring. If<br />

occupancy exceeds 75% for 3<br />

consecutive years, initiate discussions<br />

with the Forest Service about potential<br />

improvements to expand capacity.<br />

Agency Consultation to Update Plan<br />

Consult to determine if it is necessary<br />

to update the plan every 6 years.<br />

If occupancy data reaches 75% on<br />

weekends at any recreation facility,<br />

initiate second year of monitoring. If<br />

second year monitoring reaches 75%,<br />

initiate a third year of monitoring. If<br />

occupancy exceeds 75% for 3<br />

consecutive years or if the occupancy<br />

rate in the third year is less than 75%<br />

and greater than 50% and there is a<br />

clear reason for the lower occupancy<br />

rate, initiate discussions with the<br />

Forest Service about potential<br />

improvements to expand capacity.<br />

Consult to determine if it is necessary<br />

to update the plan—unspecified<br />

frequency.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!