20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Implement the Alternative 1 Whitewater Boating Flows in the Peaking<br />

Reach<br />

The Alternative 1 and staff-recommended whitewater boating flow measure,<br />

which is consistent with that specified in Forest Service condition no. 39, is more<br />

detailed than PCWA’s proposed whitewater boating flow measure and includes<br />

generally higher flows. Table 5-5 shows the flows recommended for providing class IV<br />

boating opportunities in the peaking reach, and table 5-6 shows the flows recommended<br />

for providing class II boating on the Confluence Run (downstream of the confluence of<br />

the <strong>Middle</strong> <strong>Fork</strong> and the North <strong>Fork</strong> <strong>American</strong> <strong>River</strong>).<br />

Table 5-5. Staff-recommended flow schedule to support class IV boating<br />

opportunities on the peaking reach downstream of Oxbow powerhouse<br />

(Source: Forest Service, 2011a, as modified by staff).<br />

Water Year<br />

Type<br />

Weekdays<br />

Flow a<br />

(cfs)<br />

Wet 1,000 3 hours<br />

(9 a.m.–noon)<br />

Above<br />

normal<br />

Below<br />

normal<br />

Duration<br />

(Time of day) June 1–Labor Day<br />

1,000 3 hours<br />

(9 a.m.–noon)<br />

1,000 3 hours<br />

(9 a.m.–noon)<br />

Dry 1,000 3 hours<br />

(8 a.m.–11 a.m.)<br />

Critical 1,000 3 hours<br />

(8 a.m.–11 a.m.)<br />

Extremely<br />

critical<br />

1,000 3 hours<br />

(8 a.m.–11 a.m.)<br />

328<br />

5 days per week<br />

(M–F)<br />

5 days per week<br />

(M–F)<br />

4 days per week<br />

(T–F)<br />

3 days per week<br />

(T, W, F) except<br />

for F before Labor<br />

Day<br />

2 days per week<br />

(W, F) except for<br />

Memorial Day b<br />

1 day per week<br />

(W)<br />

After Labor Day–<br />

September 30<br />

4 days per week<br />

(T–F)<br />

3 days per week<br />

(T, W, F)<br />

3 days per week<br />

(T, W, F)<br />

2 days per week<br />

(W, F)<br />

--<br />

--