303<br />

c Base 2010 costs were provided by PCWA in their license application filed May 12, 2011.<br />

d Base 2010 costs were provided by PCWA in their supplemental filing dated November 30, 2011.<br />

e<br />

Costs provided by staff; in some cases, these costs were based on similar costs provided by PCWA for proposed or<br />

Alternative 1 costs.<br />

f<br />

The implementation cost for this measure is assumed by staff to be included in the costs for the Sediment Management<br />

Plan shown above.<br />

g<br />

PCWA proposes to implement the measure, but did not assign a specific cost for the implementation. Despite the fact<br />

that no cost was provided by PCWA, the measure is included to provide comparison to what is included in Alternative 1.<br />

h<br />

PCWA did not provide a cost to implement their proposed measure. Staff assumes that this will not be a significant cost<br />

to PCWA and the alternative measures would not be appreciably more expensive than what is proposed by PCWA.<br />

i<br />

We have no basis to estimate a cost for this measure.