20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Reservoir Level Objectives<br />

Forest Service condition no. 37 also specifies mid-summer reservoir elevations at<br />

French Meadows and Hell Hole reservoirs to maintain functioning facilities (e.g., boat<br />

ramps), support current and future recreational uses, and maintain aesthetic qualities.<br />

The specified reservoir elevations (table 3.3.5-8) would be operational goals rather than<br />

compliance targets. If PCWA determines the specified projected elevations could not be<br />

met during any given year, the condition describes the detailed consultation process that<br />

would occur with the Forest Service including the possibility of requiring PCWA-funded<br />

measures such as additional patrols, shoreline protection from motorized use, and<br />

additional public information. PCWA would be required to prepare a report every 5<br />

years that documents whether the mid-summer targets were achieved and provides the<br />

reasons for and time periods when the targets were not achieved. The report would be<br />

provided to the Forest Service, California Fish and Game, and Water Board and filed<br />

with the Commission.<br />

Table 3.3.5-8. Reservoir level objectives specified in Forest Service condition no. 37<br />

(Source: Forest Service, August 2011).<br />

Reservoir Level Objective (feet)<br />

to be Met by July 15 (unless otherwise noted)<br />

Water Year Type French Meadows Reservoir Hell Hole Reservoir<br />

Wet 5,245 4,590<br />

Above normal 5,245 4,580<br />

Below normal 5,240 4,570<br />

Dry 5,220 4,530<br />

Critical 5,200 4,530<br />

Extremely critical None 4,450 a<br />

a Reservoir level objective to be met September 1.<br />

Our Analysis<br />

The mid-summer reservoir objectives specified in the Forest Service condition are<br />

similar to the water surface elevations that typically occur under existing project<br />

operations. Reservoir levels based on projected future demand are also similar to or<br />

greater than what is specified by the Forest Service. Because the mid-summer reservoir<br />

elevations would not be compliance targets, this measure would not have a predictable<br />

effect on reservoir boating access at French Meadows and Hell Hole reservoirs although<br />

the objectives may encourage PCWA to maintain higher mid-summer reservoir<br />

elevations which would improve conditions for boaters. Although the water surface<br />

elevations specified in the condition are objectives rather than compliance targets, the<br />