18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

years. The average duration of inundation (average days per year) would increase under<br />

the proposed action by 8 days in wet years, by 9 days in above normal years, and by 8<br />

days in below normal years. Similar to existing conditions, Area 2a would not be<br />

inundated in dry or critical water years under the proposed action. Therefore, changes in<br />

operations that affect the surface elevation in Hell Hole reservoir would result in only<br />

minor changes in the frequency and duration of inundation in areas that support Stebbins’<br />

phacelia in Areas 1 and 2a.<br />

Table 3.3.3-6. Stebbins’ phacelia populations at Hell Hole reservoir that may be<br />

affected by the proposed Hell Hole reservoir seasonal storage<br />

increase (Source: PCWA, 2008a).<br />

Area Definition<br />

Area 1 At or below the current<br />

maximum normal operating<br />

water surface elevation of 4,630<br />

feet down to about 4,605 feet<br />

Area 2a Maximum normal operating<br />

water surface elevation of 4,630<br />

feet to 4,636 feet with<br />

installation of 6 foot spillway<br />

crest gates<br />

Area 2b From 4,636 feet with<br />

installation of 6 foot gate to the<br />

maximum flood pool elevation<br />

at 4,640 feet with installation of<br />

10-foot gate<br />

170<br />

Area<br />

(square feet) (acres)<br />

No. Individuals<br />

17,910 0.41 9,000–18,000<br />

107,727 2.47 54,000–108,000<br />

198,290 4.55 99,000–198,000<br />

In Area 2b, which was not inundated in any water year type in the period of record<br />

under existing conditions, portions of the area would be inundated under the proposed<br />

action in years when Hell Hole reservoir spills (i.e., in 6 of 10 wet water years and in 1 of<br />

6 above normal water years) during the growing season for Stebbins’ phacelia. The<br />

average duration of inundation under the proposed action would be 22 days per year in<br />

wet water years and 15 days in above normal water years. Similar to existing conditions,<br />

Area 2b would not be inundated in below normal, dry, or critical water years under the<br />

proposed action. Area 2b supports a substantially greater population size than that<br />

supported by Area 2a and Area 1, potentially because current conditions are more<br />

suitable in this area as opposed to closer to the water. Therefore, it is possible that there<br />

would be a reduction in size of the population of Stebbins phacelia in Area 2b.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!