20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Table 3.3.5-6. Notable facility differences between the Proposed and Alternative 1<br />

recreation plans (Source: PCWA, 2011a; PCWA, 2011c)<br />

Proposed Recreation Plan Alternative 1 Recreation Plan<br />

Ahart Campground<br />

Maintain 12-site capacity. Reduce from 12 to 11 sites.<br />

French Meadows Campground<br />

Maintain 75-site capacity, replace<br />

restrooms and upgrade certain site<br />

components within 4 to 6 years.<br />

Lewis Campground<br />

Maintain 40-site capacity and replace<br />

and upgrade certain site components<br />

within 2 to 6 years.<br />

Poppy Campground<br />

Reduce from 12 to 8 sites and redesign<br />

and reconstruct within 2 years.<br />

Coyote Group Campground<br />

Upgrade selected site components<br />

within 3 to 4 years.<br />

Gates Group Campground<br />

Upgrade selected site components<br />

within 5 years.<br />

French Meadows Picnic Area and Boat Ramp<br />

Maintain configuration of 4 picnic sites<br />

and upgrade selected site components<br />

within 3 to 6 years.<br />

Extend boat ramp to about 5,175 feet,<br />

or as far as possible, within 1 year.<br />

McGuire Boat Ramp and Parking Area<br />

Consolidate parking areas for Poppy<br />

Campground and McGuire Boat Ramp,<br />

replace signage, reseal boat ramp and<br />

repair concrete turnaround within 3 to<br />

4 years.<br />

216<br />

Reduce from 75 to 70 sites with 6 sites<br />

converted to 3 double sites and<br />

redesign and reconstruct within 5<br />

years.<br />

Reduce from 40 to 38 sites with 2 sites<br />

converted to 1 double site and redesign<br />

and reconstruct within 9 years.<br />

Reduce from 12 to 8 sites and redesign<br />

and reconstruct within 13 years.<br />

Redesign and reconstruct within 13<br />

years.<br />

Redesign and reconstruct within 11<br />

years.<br />

Redesign and reconstruct with 2 of the<br />

4 picnic sites relocated to be near the<br />

ramp parking area within 7 years.<br />

Extend boat ramp to about 5,175 feet,<br />

or as far as possible, within 6 years.<br />

Consolidate parking areas for Poppy<br />

Campground and McGuire Boat Ramp,<br />

replace signage, reseal boat ramp and<br />

repair concrete turnaround within 13<br />

years.