20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Proposed Recreation Plan Alternative 1 Recreation Plan<br />

Trail) and along Western States Trail<br />

in the vicinity of French Meadows dam<br />

within 1 year.<br />

Extend Poppy Trail to the McGuire<br />

Boat Ramp Parking Area within 4<br />

years.<br />

219<br />

(between French Meadows<br />

Campground and dam) for pedestrian<br />

use within 14 years. These would be<br />

new project facilities.<br />

Extend Poppy Trail (Forest Trail<br />

16E10) to the McGuire Boat Ramp<br />

Parking Area and reconstruct this trail<br />

to Poppy Campground within 13 years.<br />

This would be a new project facility.<br />

No comparable measure in this plan. Upgrade existing trail to stream gage<br />

from near Duncan Creek diversion dam<br />

(Forest Trail 13E33) for pedestrian use<br />

within 3 years. This would be a new<br />

project facility.<br />

No comparable measure in this plan. Upgrade existing trail to stream gage<br />

from Ralston afterbay picnic area<br />

within 5 years. This would be a new<br />

project facility.<br />

No comparable measure in this plan. Construct a trail to provide pedestrian<br />

access to the <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong><br />

<strong>River</strong> below <strong>Middle</strong> <strong>Fork</strong> interbay dam<br />

within 3 years. This would be a new<br />

project facility.<br />

Develop a GIS-based trail map and<br />

post at kiosks within 1 year.<br />

Notes: GIS – geographic information systems<br />

PAOT – persons at one time<br />

Recreation Plan—Implementation and Plan Organization<br />

Develop a GIS-based trail map and<br />

post at kiosks within 3 years.<br />

PCWA’s proposed Recreation Plan is very similar to the Alternative 1 Recreation<br />

Plan referenced in Forest Service condition no. 33. Whereas PCWA generally proposes<br />

implementing actions within 1 to 6 years, the Alternative 1 plan specifies delaying<br />

implementation for up to 14 years.<br />

Our Analysis<br />

PCWA’s proposal would provide recreational benefits sooner than what would be<br />

provided by Forest Service condition no. 33. Considering most recreation facilities are in<br />

good condition the most notable effect would be delaying accessibility compliance.