18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

299<br />

Enhancement/Mitigation<br />

Measures Entities<br />

42b. Conduct fish stocking in Hell<br />

Hole and French Meadows<br />

reservoirs on an annual basis during<br />

the term of the license equivalent to<br />

100% of California Fish and<br />

Game’s annual management target<br />

or 100% of the historical average<br />

stocking into the reservoir (2001-<br />

2009), whichever is less<br />

43. Perform trail-related<br />

enhancements<br />

44. Conduct annual consulting and<br />

reporting<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

PCWA, Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

PCWA, Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

45. Provide 6-year reporting PCWA, Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

46. Disseminate real-time flow and<br />

reservoir WSE information<br />

PCWA, Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

Capital Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Annual Cost<br />

(2012$) a<br />

$0 $61,900 $61,900 d<br />

$15,740 $3,150 $4,410 c<br />

$0 $12,590 $12,590 c<br />

$0 $5,040 $5,040 c<br />

$0 $21,510 $21,510 c

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!