20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

access road to the new spillway gates; and (5) modify the instream flow outlet to<br />

maintain proposed increased instream flows.<br />

2.2.1.4 North and South <strong>Fork</strong> Long Canyon Diversion Modifications<br />

PCWA proposes to modify the North <strong>Fork</strong> Long Canyon and South <strong>Fork</strong> Long<br />

Canyon diversions as follows: (1) construct a new wedge-wire screen intakes on the<br />

upstream side of the existing ogee section of the diversion weirs; (2) construct new<br />

concrete chambers to connecting the intake channels with the existing intakes to the<br />

existing buried discharges that convey the diverted flow to the top of the shafts that drop<br />

into the Hell Hole-<strong>Middle</strong> <strong>Fork</strong> tunnel; (3) increase the height of the weir abutments by<br />

2.7 feet at the North <strong>Fork</strong> diversion and 3.5 feet at the South <strong>Fork</strong> diversion for adequate<br />

freeboard during floods; (4) install a remote controlled slide gate to control tunnel inflow;<br />

(5) modify the existing low-level outlets through the dams for dewatering the<br />

impoundments and for discharging instream flows downstream of the weirs and<br />

decommission of the existing instream flow release outlets at the North <strong>Fork</strong> diversion;<br />

(6) modify existing instream flow outlets to maintain increased instream flows, facilitate<br />

bedload transport, and establish first priority for water flowing into the wedge-wire<br />

intake; (7) implement security improvements; (8) install new communications uplinks;<br />

and (9) install a self-contained solar/thermal electric power supply system.<br />

2.2.1.5 <strong>Middle</strong> <strong>Fork</strong> Interbay Dam Outlet Works Modification<br />

PCWA proposes to modify the existing instream flow outlet at the dam to<br />

maintain the proposed increased instream flows and facilitate bedload transport.<br />

2.2.1.6 Proposed Flow Measurement Equipment<br />

PCWA proposes installing new flow measurement equipment and adding two<br />

existing stream gages (Rubicon <strong>River</strong> above Ralston powerhouse and Rubicon <strong>River</strong><br />

above Ellicott Bridge) as part of a new license, including the following:<br />

• a new gage on the Duncan Creek diversion tunnel;<br />

• new flow measurement equipment on the <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> at the<br />

outlet of the French Meadows dam instream flow maintenance pipe and the<br />

low level outlet pipe;<br />

• new flow measurement equipment on the Rubicon <strong>River</strong> at the outlet of the<br />

Hell Hole dam instream flow maintenance pipe and low level outlet pipe;<br />

• a new gage on the Rubicon <strong>River</strong> at the Hell Hole spillway;<br />

• a new gage on the North <strong>Fork</strong> Long Canyon Creek downstream of the<br />

diversion dam;<br />

• a new gage on the South <strong>Fork</strong> Long Canyon Creek downstream of the<br />

diversion dam;<br />

21