18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

a<br />

The existing license requirement specifies storage volume in three categories of water<br />

year types based on forecast inflow to Folsom reservoir. Where water year types in<br />

the existing license overlap water year types used in the proposed measures, both of<br />

the applicable elevations are provided. Elevations provided for no action correspond<br />

to volumes listed in PCWA’s instream flow requirement measure.<br />

b<br />

Minimum pool requirements end on Labor Day.<br />

c Minimum pool requirements begin on the day after Labor Day.<br />

d Minimum pool requirements end on September 15.<br />

e<br />

Minimum pool requirements end on September 1.<br />

f<br />

Minimum pool requirements begin on September 16.<br />

g Minimum pool requirements begin on September 2.<br />

Our Analysis<br />

As compared to existing operations, the minimum pools proposed by PCWA<br />

would:<br />

• result in higher minimum summer water surface elevations in French Meadows<br />

reservoir during wet and above normal water year types;<br />

• result in lower winter minimum water surface elevations in French Meadows<br />

reservoir during wet and above normal water year types (enhance capacity to<br />

accommodate spring runoff);<br />

• result in higher winter minimum water surface elevations in French Meadows<br />

reservoir during critical water year types;<br />

• result in higher minimum summer water surface elevations in Hell Hole<br />

reservoir during wet, above normal, below normal, and critical water year<br />

types;<br />

• result in higher winter minimum water surface elevations in Hell Hole<br />

reservoir during critical water year types; and<br />

• implement the summer/winter minimum pool elevation immediately after<br />

Labor Day instead of at the end of September.<br />

The Forest Service condition would provide these same circumstances and also<br />

result in in higher minimum water surface elevations in French Meadows reservoir during<br />

below normal and critical water year types as compared to the existing license conditions.<br />

Whereas PCWA’s proposal for minimum reservoir elevations transitions from summer to<br />

fall on Labor Day, the Forest Service condition transitions at different times based on<br />

water year type.<br />

225

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!