18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

285<br />

Enhancement/Mitigation<br />

Measures Entities<br />

5b. Redesign and reconstruct Gates<br />

Group Campground within 11 years<br />

6a. Upgrade selected site<br />

components at Coyote Group<br />

Campground within 3 to 4 years<br />

6b. Redesign and reconstruct<br />

Coyote Group Campground within<br />

13 years<br />

7a. Maintain the 40-site capacity of<br />

Lewis Campground and replace and<br />

upgrade certain site components<br />

within 2 to 6 years<br />

7b. Reduce the capacity of Lewis<br />

Campground from 40 sites to 38<br />

sites with 2 sites converted to 1<br />

double site and redesign and<br />

reconstruct within 9 years<br />

8a. Convert the McGuire Picnic<br />

Area to a group campground with<br />

two 25-PAOT sites within 4 years<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$194,010 $0 $15,540 d<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$209,830 $0 $16,800 d<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$83,930 $0 $6,720 d<br />

PCWA, staff $347,070 $0 $27,800 c

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!