18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

280<br />

Enhancement/Mitigation<br />

Measures Entities<br />

2c. Implement the Alternative 1<br />

Streamflow Gaging Plan, excluding<br />

three gages (Rubicon <strong>River</strong> above<br />

Ellicott Bridge, Rubicon <strong>River</strong><br />

above Ralston powerhouse, and<br />

North <strong>Fork</strong> <strong>American</strong> <strong>River</strong> above<br />

the <strong>American</strong> <strong>River</strong> Pump Station<br />

3a. Implement the Water Quality<br />

Monitoring Plan<br />

3b. Finalize and implement the<br />

Water Quality Monitoring Plan<br />

4. Implement the Water<br />

Temperature Monitoring Plan<br />

5a. Implement the Mercury<br />

Bioaccumulation Monitoring Plan<br />

5b. Finalize and implement the<br />

Mercury Bioaccumulation<br />

Monitoring Plan<br />

6a. Implement the Fish Population<br />

Monitoring Plan<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

Staff $78,680 $123,800 $130,100 e<br />

PCWA, staff $0 $23,610 $23,610 c<br />

Forest Service,<br />

California Fish and<br />

Game (Alternative 1)<br />

$5,000 $23,610 $24,010 e<br />

PCWA, staff<br />

(Alternative 1)<br />

$58,750 $45,320 $50,030 c<br />

PCWA $0 $17,840 $17,840 c<br />

Forest Service,<br />

California Fish and<br />

Game (Alternative 1)<br />

$5,000 $17,840 $18,240 c<br />

PCWA $61,900 $72,390 $77,350 c

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!