20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Table 4-1. Parameters for the economic analysis of the <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong><br />

<strong>Project</strong>.<br />

Assumption Value Source<br />

Period of economic analysis<br />

(years)<br />

Current net investment<br />

(2011 dollars) a<br />

Current annual costs<br />

including operation and<br />

maintenance, and FERC fees<br />

(2011 dollars) b<br />

274<br />

30 Staff<br />

$0<br />

$19,040,000 PCWA<br />

Relicense application costs c $52,100,000 PCWA<br />

Term of financing (years) 20 Staff<br />

Cost of capital (percent) d 6.25 PCWA<br />

Discount rate (percent) e 8 Staff<br />

Energy rate ($/MWh) f 37.69 PCWA<br />

Capacity rate<br />

($/kilowatt-year) g<br />

36 PCWA<br />

a<br />

Net investment not provided in the license application.<br />

b<br />

Annual costs were derived from exhibit D, section 4(iv) of the license application.<br />

c<br />

The cost to develop the license application was provided in exhibit D, section 5 of<br />

the license application.<br />

d<br />

The cost of capital was in exhibit E, section 11, table 11-1 of the license application.<br />

e<br />

The discount rate was not provided in the license application, and was therefore<br />

approximated by staff.<br />

f<br />

The energy rate is the average of the on-peak ($41.66/MWh) and off-peak<br />

($30.07/MWh) rates provided in exhibit D, section 8 of the license application.<br />

g<br />

The capacity rate was provided in exhibit D, section 5 of the license application.<br />

4.2 COMPARISON OF ALTERNATIVES<br />

Table 4-2 compares the annual costs and annual power benefits for the three<br />

alternatives considered in this draft <strong>EIS</strong>: no action, PCWA’s proposal, the staff<br />

alternative, Alternative 1, and the staff alternative with mandatory conditions.