18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

106<br />

October<br />

November<br />

December<br />

Proposed Action (Alternative 1, when different from proposed flows)<br />

January<br />

February<br />

March 1-14<br />

Location<br />

Water<br />

Year<br />

Type a<br />

below Oxbow<br />

75 75 75 75 75 75 125 125 125 125 100 100 100 100 75 75<br />

powerhouse C (125) (140) (140) (140) (140) (140) (160) (160) (160) (160) (160) (160) (160) (160) (150) (150)<br />

90 90 90 90 90 90 210 210 210 210 150 150 150 150 120 90<br />

D (140) (145) (145) (145) (145) (145)<br />

(210) (210) (200) (200) (160) (160)<br />

120 120 120 120 120 120 290 290 290 290 200 200 200 200 160 120<br />

BN (165) (185) (185) (185) (185) (185)<br />

(245) (245) (245) (245) (200) (200)<br />

150 150 150 150 150 150 375 375 375 375 250 250 250 250 200 150<br />

AN (165) (225) (225) (225) (225) (225)<br />

(300) (300) (300) (300) (250) (250)<br />

200 200 200 200 200 200 450 450 450 450 300 300 300 300 250 200<br />

W (250) (250) (250) (250) (250)<br />

(350) (350) (350) (350) (300) (300)<br />

<strong>Middle</strong> <strong>Fork</strong> E 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3<br />

<strong>American</strong> <strong>River</strong><br />

below Ralston All other<br />

3 3 3 3 3 3 3 (25) 3 (25) 3 (25) 3 (25) 3 (10) 3 (10) 3 (10) 3 (10) 3 (10) 3 (10)<br />

afterbay dam years<br />

Notes: Minimum instream flows in parentheses are flows included in Alternative 1 and not the proposed project.<br />

Grey-shaded cells indicate the minimum flow is the specified minimum flow or natural inflow to the bypassed<br />

reach, whichever is less<br />

a Water year types: E = Extreme critical, C = Critical, D = Dry, BN = Below normal, AN = Above normal, W = Wet<br />

b ND = no diversion. If July 1 inflow to the Duncan Creek diversion exceeds the May minimum instream flow<br />

requirement, then the July minimum instream flow requirement will be equal to the May minimum instream flow<br />

requirement or natural inflow, whichever is less. The intent is to avoid a large flow spike at the end of the diversion<br />

season on July 1.<br />

March 15-31<br />

April<br />

May 1–14<br />

May 15–31<br />

June 1–14<br />

June 15–30<br />

July<br />

August<br />

Sept. 1–15<br />

Sept. 15–30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!