18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Recreation Resources<br />

• Implement the following proposed recreation-related measures: (1) consult<br />

with agencies at 6-year intervals regarding the need to update the final<br />

recreation plan; (2) conduct recreation use monitoring and develop recreation<br />

summary reports every 6 years; (3) enhance the primitive recreation site at the<br />

Duncan Creek diversion within 3 years; (4) convert the McGuire picnic area<br />

to a group campground with two 25-PAOT sites within 4 years; (5) replace<br />

recycling containers, drill a well, and replace the water storage tank, supply,<br />

and distribution lines at <strong>Middle</strong> Meadows Campground within 5 years; (6)<br />

extend the Poppy trail and reconstruct the existing Poppy trail within 13<br />

years; (7) conduct annual consultation with agencies and associated<br />

reporting; and (8) disseminate real-time flow and reservoir water surface<br />

elevation information to the public.<br />

Land Use<br />

• Implement the Transportation System Management Plan as modified by<br />

Alternative 1, with visual condition assessments every 6 years instead of<br />

every 5 years to be consistent with the reporting intervals of the required<br />

Form 80 monitoring reports.<br />

• Implement the Fire Prevention and Suppression Plan.<br />

• Adjust the project boundary to include the following facilities or areas:<br />

Duncan Creek diversion intake road;<br />

Trail to the gage below Duncan Creek diversion dam;<br />

French Meadows campground water supply and road;<br />

French Meadows reservoir north shore access road;<br />

Gates campground and access road;<br />

French Meadows North (Dolly Creek) water system;<br />

Ahart campground;<br />

French Meadows-Hell Hole tunnel portal road;<br />

French Meadows powerhouse road and communication powerline;<br />

Hell Hole dam spillway discharge channel road;<br />

Hell Hole vista parking area, trail and overlook;<br />

Hell Hole reservoir trail;<br />

Big Meadows campground and access road;<br />

Big Meadows campground water supply and access road;<br />

Hell Hole campground water supply;<br />

314

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!