18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

COVER SHEET<br />

a. Title: Relicensing the <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> <strong>Project</strong>, FERC <strong>Project</strong><br />

No. 2079-069.<br />

b. Subject: <strong>Draft</strong> Environmental Impact Statement<br />

c. Lead Agency: Federal Energy Regulatory Commission (Commission)<br />

d. Abstract: The <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> <strong>Project</strong> (FERC No. 2079-069) is<br />

located in Placer and El Dorado Counties, California. The existing<br />

project affects 1,883 acres within the Tahoe National Forest and<br />

1,385 acres within Eldorado National Forest both of which are<br />

administered by the U.S. Department of Agriculture-Forest Service.<br />

Placer County Water Agency (PCWA) proposes modifications to<br />

the diversion structures, and French Meadow, Hell Hole, and<br />

<strong>Middle</strong> <strong>Fork</strong> interbay outlet works to accommodate increased<br />

instream flows. PCWA also proposes to increase the storage<br />

capacity of Hell Hole reservoir by approximately 7,600 acre-feet<br />

which, in turn, would increase the average annual generation at the<br />

Hell Hole powerhouse.<br />

The staff’s recommendation is to relicense the project as proposed,<br />

with certain modifications, and additional measures recommended<br />

by the agencies.<br />

e. Contact: Carolyn Templeton<br />

Federal Energy Regulatory Commission<br />

Office of Energy <strong>Project</strong>s<br />

888 First Street, N.E.<br />

Washington, DC 20426<br />

(202) 502-8785<br />

f. Transmittal: This draft environmental impact statement to relicense the <strong>Middle</strong><br />

<strong>Fork</strong> <strong>American</strong> <strong>River</strong> Hydroelectric <strong>Project</strong> is being made available<br />

for public comment on or about August 3, 2012, as required by the<br />

National Environmental Policy Act of 1969 1 and the Commission’s<br />

Regulations Implementing the National Environmental Policy Act<br />

(18 CFR, Part 380).<br />

1 National Environmental Policy Act of 1969, amended (Pub. L. 91-190. 42 U.S.C.<br />

4321-4347, January 1, 1970, as amended by Pub. L. 94-52, July 3, 1975, Pub. L. 94-83,<br />

August 9, 1975, and Pub. L. 97-258, § 4(b), September 13, 1982).<br />

iii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!